Sl. No |
Name of Project |
Country |
Client |
Funded by |
Start |
End |
Roads, Railways, Bridges |
|
|
|
|
|
1 |
Consultancy Services for Design and Partial Supervision of Conversion of Meter Gauge (MG) Railway bridges into Dual Gauge (DG)/Broad Gauge (BG) bridges on Parabatipur-Kanchan-Panchagarh and Kanchan-Birol-Birol Border section of Bangladesh Railway |
Bangladesh |
Bangladesh Railway |
Government of Bangladesh |
Feb-12 |
Dec-14 |
2 |
Padma Multipurpose Bridge Construction Supervision Project (Main Bridge & River Training) |
Bangladesh |
Bangladesh Bridge Authority |
Government of Bangladesh |
Nov-14 |
Jun-22 |
3 |
Dhaka-Chittagong Expressway PPP Design Project |
Bangladesh |
Roads & Highways Department |
Asian Development Bank |
Jul-14 |
Jul-17 |
4 |
Greater Dhaka Sustainable Transport -Package 1 |
Bangladesh |
Roads & Highways Department |
Asian Development Bank |
Apr-13 |
Jun-21 |
5 |
Greater Dhaka Sustainable Transport -Package 2 |
Bangladesh |
Roads & Highways Department |
Asian Development Bank |
May-13 |
Jun-21 |
6 |
Detail Engineering Design Work for Bus Rapid Transit Line-3 |
Bangladesh |
Dhaka Transport Coordination Authority |
World Bank |
Nov-13 |
Mar-15 |
7 |
Beautification of Bangabandhu Bridge Project |
Bangladesh |
Bangladesh Bridge Authority |
Bangladesh Bridge Authority |
Jul-10 |
Feb-11 |
8 |
Design and Construction Supervision of Kanchpur-Meghna and Gumti 2nd Bridges Project |
Bangladesh |
Roads & Highways Department |
Japan Bank for International Cooperation |
Feb-14 |
Oct-21 |
9 |
Feasibility Study and Detailed Design for the Subregional Transport Project Preparatory Facility Project (Rail Component) |
Bangladesh |
Bangladesh Railway |
Bangladesh Railway |
Nov-13 |
Jun-16 |
10 |
Dhaka Mass Rapid Transit Development Project |
Bangladesh |
Office of the Managing Director; Special Project Organization |
Asian Development Bank |
Jul-14 |
Dec-16 |
11 |
Feasibility Study, Safeguard Policy Studies, Detailed Engineering Design and Tendering Services for Construction of Railway Line from Navaran to Munshiganj via Sathkhira |
Bangladesh |
Bangladesh Railway |
Bangladesh Railway |
Jul-13 |
Sep-14 |
12 |
Subregional Transport Project Preparatory Facility (Road Component: Package-1) under Technical Assistance for Subregional Road Transport Project Preparatory Facility |
Bangladesh |
Roads & Highways Department |
Government of Bangladesh |
Aug-12 |
Mar-14 |
13 |
Feasibility Study for Multilane Road Tunnel from Zahangir Gate of Dhaka Mymensingh Road to Rokeya Sharani at Dhaka City |
Bangladesh |
Bangladesh Bridge Authority |
Government of Bangladesh |
May-11 |
Oct-11 |
14 |
Dhaka Chittagong Railway Development Project |
Bangladesh |
Bangladesh Railway |
Japan Bank for International Cooperation |
Jul-09 |
Jun-15 |
15 |
Bangladesh Railway Sector Improvement Project -Implementation Consulting Service |
Bangladesh |
Bangladesh Railway |
Asian Development Bank |
Aug-07 |
Jun-17 |
16 |
Second Rural Infrastructure Improvement Project (RIIP – 2): Design, Supervision and Monitoring Consultancy Services |
Bangladesh |
Local Government Engineering Department |
Asian Development Bank |
May-07 |
Jun-11 |
17 |
Bangladesh Railway Sector Investment Program – Tranche 2 |
Bangladesh |
Bangladesh Railway |
Asian Development Bank |
Jan-14 |
Mar-18 |
18 |
Consultancy Services for Feasibility Study, Environmental & Social Studies, Detailed Engineering Design and Tendering Services for Construction of a New Railway Line from Majhgram to Dhalarchar via Pabna |
Bangladesh |
Bangladesh Railway |
Government of Bangladesh |
May-11 |
Sep-12 |
19 |
Techno-economical Feasibility Study, Safeguard Policy Studies, Detailed Engineering Design, Tendering Services and Supervision for Construction of Railway Link from Kashiani-Gopalganj-Tungipara new Railway Line |
Bangladesh |
Bangladesh Railway |
Government of Bangladesh |
May-11 |
Dec-18 |
20 |
Chittagong City Outer Ring Road Project |
Bangladesh |
Chittagong Development Authority |
Japan International Cooperation Agency |
Jul-11 |
Aug-21 |
21 |
Conducting Feasibility for Construction of Railway cum Road Bridge (Extra Dosed Type Bridge) across River Karnaphuly at Kalurghat point in the vicinity of existing railway bridge at Chittagong District. |
Bangladesh |
Bangladesh Railway |
Government of Bangladesh |
Aug-11 |
May-12 |
22 |
Supervision and Monitoring Consultancy Services (Contract Package SA-4) under RTIP |
Bangladesh |
Local Government Engineering Department |
International Development Association |
Apr-11 |
Jun-11 |
23 |
Padma Multipurpose Bridge Design Project |
Bangladesh |
Bangladesh Bridge Authority |
Asian Development Bank |
Feb-09 |
Jun-11 |
24 |
Chittagong Port Trade Facilitation Project: Detailed Design and Construction Supervision of Connector Road/ Flyover |
Bangladesh |
Roads & Highways Department |
Government of Bangladesh |
Jul-06 |
Jun-11 |
25 |
Hairatan to Mazar-e-Sharif Railway Development Project |
Afghanistan |
SMEC International Pty Ltd./Ministry of Public Works, Islamic Republic of Afghanistan |
Asian Development Bank |
Feb-10 |
Mar-11 |
26 |
Consultancy Services for Preparation of Detailed Project Report (DPR) for Chagcharan-Garden Dewal Road Project |
Afghanistan |
SMEC International Pty Ltd. / Ministry of Public Works |
Government of Afghanistan |
Nov-08 |
Jan-11 |
27 |
Emergency Disaster Damage Rehabilitation Project/ Rehabilitation of Flood-Damage Roads & Bridges |
Bangladesh |
Roads & Highways Department |
Asian Development Bank |
Dec-07 |
Dec-10 |
28 |
Andkhoy – Qaisar Road Project – Construction Supervision |
Afghanistan |
SMEC International Pty Ltd. / Ministry of Public Works |
Asian Development Bank |
Aug-06 |
Nov-10 |
29 |
Kabul Urban Reconstruction Project – Engineering and Management Support |
Afghanistan |
SMEC International Pty Ltd. / Ministry of Urban Development |
World Bank (International Development Association) |
Feb-06 |
Sep-09 |
30 |
Rehabilitation of Taloqan-Faizabad Road Project |
Afghanistan |
SMEC International Pty Ltd. / Ministry of Public Works |
World Bank (International Development Association) |
Oct-03 |
Aug-08 |
31 |
Road Master Plan and Feasibility Study for Road Development in Western Aimags |
Mongolia |
SMEC International Pty Ltd. / Ministry of Roads, Transport and Tourism |
World Bank |
Apr-07 |
Nov-07 |
32 |
Feasibility Study for Improvement and Rehabilitation of Branch Lines of Bangladesh Railway |
Bangladesh |
Bangladesh Railway |
Government of Bangladesh |
Jan-07 |
Jun-07 |
33 |
Feasibility Study for Conversion/Construction of Dhaka-Chittagong Railway Line into Double Track with Electric Traction |
Bangladesh |
Bangladesh Railway |
Government of Bangladesh |
May-06 |
Apr-07 |
34 |
Traffic Study of Railway Level Crossing at Phulbari-Khulna under Phulbari Coal Mine Project |
Bangladesh |
Asia Energy Corporation |
Asia Energy Corporation |
Jan-06 |
Feb-06 |
35 |
Shikarpur & Doarika Bridge and Approach Road Project |
Bangladesh |
Roads & Highways Department |
Kuwait Fund for Arab Economic Development |
Jan-00 |
Apr-03 |
36 |
Access Road Construction of Matarbari Ultra Super Coal Power Project |
Bangladesh |
Roads & Highways Department |
Japan International Cooperation Agency |
Apr-16 |
Mar-22 |
37 |
Western Bangladesh Bridge Improvement Project |
Bangladesh |
Roads & Highways Department |
Japan International Cooperation Agency |
Mar-16 |
Mar-21 |
38 |
Construction Supervision of Multi-Lane Road Tunnel under Karnaphuli River |
Bangladesh |
Bangladesh Bridge Authority |
Government of Bangladesh |
Nov-16 |
Sep-21 |
39 |
Construction Supervision for Jamuna railway Bridge Project |
Bangladesh |
Bangladesh Railway |
Japan International Cooperation Agency |
Apr-17 |
Jul-23 |
40 |
Construction Supervision of Padma Rail Link Project |
Bangladesh |
Bangladesh Railway |
Government of Bangladesh |
Mar-17 |
Jun-23 |
41 |
Cross Border Road Network Improvement Project |
Bangladesh |
Roads & Highways Department |
Japan International Cooperation Agency |
Jan-17 |
Nov-22 |
42 |
Bangabondhu Sheikh Mujib International Airport Project |
Bangladesh |
Civil Aviation Authority of Bangladesh |
Japan International Cooperation Agency |
Nov-16 |
Mar-18 |
43 |
Proof Consultant of Structural Design of 3rd Shitalakhya Bridge |
Bangladesh |
Roads & Highways Department |
Government of Bangladesh |
Jun-19 |
Ongoing |
44 |
Dhaka-Chittagong SASEC Rail Project |
Bangladesh |
Bangladesh Railway |
Asian Development Bank |
Jun-17 |
Jun-21 |
45 |
Dohazari-Cox’s Bazar Rail Construction Supervision Project |
Bangladesh |
Bangladesh Railway |
Asian Development Bank |
Sep-17 |
Aug-22 |
46 |
Construction of 3rd and 4th Dual Gauge Railway Track Dhaka-Tongi |
Bangladesh |
Bangladesh Railway |
Indian Fund |
May-16 |
Jan-17 |
47 |
Chittagong EPZ Connecting Road |
Bangladesh |
Chittagong Development Authority |
Government of Bangladesh |
Mar-18 |
Apr-18 |
Architecture & Building |
|
|
|
|
|
1 |
Engineering Management Consultants (EMC) Services |
Bangladesh |
United Nations Development Programme |
United Nations Development Programme |
Mar-11 |
Jun-12 |
2 |
Extension of the Main Hospital Building Complex of HFRCH, Dhaka |
Bangladesh |
Bangladesh Red Cross Society |
Bangladesh Red Cross Society |
Oct-93 |
Oct-05 |
3 |
Remodeling of Hobiganj Palli Bidyut Samity |
Bangladesh |
Rural Electrification Board |
Government of Bangladesh |
Nov-00 |
Dec-04 |
4 |
Vertical Extension of Sreenagar Zonal Office (2nd floor) under Munshiganj PBS |
Bangladesh |
Rural Electrification Board |
Government of Bangladesh |
Mar-03 |
Dec-04 |
5 |
Construction of Palli Bidyut Samity Office at Naogaon |
Bangladesh |
Rural Electrification Board |
Government of Bangladesh |
Mar-03 |
Dec-04 |
6 |
Constriction of Nursing School over Nursing Hostel of Holy Family Red Crescent Hospital |
Bangladesh |
Bangladesh Red Crescent Society |
Bangladesh Red Crescent Society |
Sep-00 |
Nov-04 |
7 |
Establishment of Dhaka PBS-02 Head Quarters Complex |
Bangladesh |
Rural Electrification Board |
Government of Bangladesh |
Apr-01 |
Jun-04 |
8 |
Coastal Climate Resilience Infrastructure Project-CCRIP |
Bangladesh |
Local Government Engineering Department |
Asian Development Bank & KFW |
Jan-14 |
Dec-18 |
9 |
Building Construction of Natore Palli Bidyut Samity-1 |
Bangladesh |
Rural Electrification Board |
Government of Bangladesh |
Dec-01 |
Jan-03 |
10 |
20-Storied Building – Pari Bagh Garden Tower – Design & Construction Supervision |
Bangladesh |
Md. Shofiqul Islam (Sana) & Md. Mostak Ahmed Mallik |
Md. Shofiqul Islam (Sana) & Md. Mostak Ahmed Mallik |
Jan-99 |
Jan-04 |
11 |
15-Storied Nahar Plaza – Detail Engineering Design and Construction Supervision |
Bangladesh |
Nahar Group of Industries Ltd. |
Nahar Group of Industries Ltd. |
Jan-94 |
Jan-98 |
Power & Energy |
|
|
|
|
|
1 |
Management & Supervision of Implementation of New Haripur Power Plant Development Project |
Bangladesh |
The Electricity Generation Complany |
Japan Bank for International Cooperation |
Jan-09 |
Dec-14 |
2 |
Management & Implementation of Siddhirganj Peaking Power Plant |
Bangladesh |
Power Development Board |
International Development Association / World Bank |
Jan-09 |
Apr-10 |
3 |
Consultancy Services for Design, Supervision and Management of Rural Electrification Upgradation Project (Rajshahi, Rangpur, Khulna and Barisal Divisions in Bangladesh) |
Bangladesh |
Rural Electrification Board |
Japan International Cooperation Agency |
Jul-11 |
Dec-15 |
4 |
Study to Assess Effectiveness of Current Organizational Structure of REB of Bangladesh |
Bangladesh |
Power Cell, Power Division, Ministry of Power, Energy ad Mineral Resources |
International Development Association |
Nov-08 |
Mar-11 |
5 |
Bid Evaluation and Construction Supervision for the National Load Dispatch Centre Project, Bangladesh |
Bangladesh |
Power Grid Company of Bangladesh |
Asian Development Bank |
Feb-05 |
May-10 |
6 |
Rehabilitation and Expansion of Urban Electricity Distribution Network- Design and Supervision |
Afghanistan |
SMEC International Pty Ltd/ Ministry of Energy and Water |
World Bank (International Development Association) |
Jun-07 |
Aug-09 |
7 |
Study of Rail Energy Uses, Waste Hazardous Materials, Concept Design & Marshalling under Phulbari Coal Mine Project |
Bangladesh |
Asia Energy Corporation |
Asia Energy Corporation |
Feb-06 |
Mar-06 |
8 |
Investigation and Preliminary Design of New Rail Route from Khulna Bypass offtake to Rupsa River Terminal under Phulbari Coalmine Project |
Bangladesh |
Asia Energy Corporation |
Asia Energy Corporation |
Dec-05 |
Feb-06 |
9 |
Matarbari Ultra Super Coal-Fired Power Project |
Bangladesh |
Coal Power Generation Company Bangladesh Limited |
Japan International Cooperation Agency |
Feb-15 |
Feb-24 |
10 |
Up-Gradation, Rehabilitation and Intensification of Distribution System (URIDS) |
Bangladesh |
Rural Electrification Board |
Asian Development Bank |
Oct-18 |
Sep-20 |
Water Resources |
|
|
|
|
|
1 |
Design and Construction Supervision Consultancy Services under Khulna Water Supply Project |
Bangladesh |
Khulna Water Supply and Sewerage Authority |
Japan International Cooperation Agency |
May-12 |
Jun-19 |
2 |
Design, Construction Supervision and Related Services under Karnaphuli Water Supply Project – Phase 2 (KWSP2) |
Bangladesh |
Chittagong Water Supply and Sewerage Authority |
Japan International Cooperation Agency |
Feb-14 |
Oct-21 |
3 |
Corporate Management Support (CMS) Consultant Services |
Bangladesh |
Khulna Water Supply and Sewerage Authority |
Asian Development Bank |
Jun-12 |
Jun-19 |
4 |
Design and Supervision (D&S) Consultancy Services for Khulna Water Supply Project |
Bangladesh |
Khulna Water Supply and Sewerage Authority |
Asian Development Bank |
Jun-12 |
Jun-19 |
5 |
Design, Construction Supervision and Related Services Under Bhandal Juri Water Supply Project, Chittagong WASA |
Bangladesh |
Chittagong Water Supply and Sewerage Authority |
EDCF |
Oct-17 |
Jan-22 |
6 |
Gopalgonj and Bagerhat Water Supply & Sanitation Project |
Bangladesh |
DPHE |
Government of Bangladesh |
Mar-18 |
Nov-19 |
7 |
Monitoring and Eveluation (M&E) support consultancy under Emergency 2007 Cyclone Recovery and Restoration Project |
Bangladesh |
Ministry of Planning |
International Development Association, World Bank |
Feb-11 |
Jun-14 |
8 |
Consultancy Services for flood Damage Rehabilitation (FDR)-2007 (Package: BWDB s-8.1) Under WMIP |
Bangladesh |
Bangladesh Water Development Board |
The Government of Netherlands & International Development Association, World Bank |
Dec-09 |
Jun-11 |
9 |
Feasibility Study and Detail Engineering for Ganges Barrage |
Bangladesh |
Bangladesh Water Development Board |
The Government of Bangladesh |
Jul-05 |
Mar-13 |
10 |
Secondary Towns Integrated Flood Protection Project-II |
Bangladesh |
Bangladesh Water Development Board |
Asian Development Bank |
Nov-06 |
Jun-11 |
11 |
Technical Assistance Support to Barind Multi Purpose Development Authority Rajshahi Bangladesh – Rural Water Supply Project |
Bangladesh |
Danish Ministry of Foreighn Affairs |
Danish Ministry of Foreighn Affairs |
Apr-09 |
May-09 |
12 |
Consulting Services for Preparation of Detailed Design and Bidding Documents for Drainage Channels in Dhaka City (Package # DS10) |
Bangladesh |
Dhaka Water Supply and Sewerage Authority |
World Bank |
Apr-08 |
Dec-08 |
13 |
Khulna-Jessore Drainage Rehabilitation Project. |
Bangladesh |
Bangladesh Water Development Board |
Asian Development Bank |
Aug-95 |
Dec-02 |
14 |
National Minor Irrigation Development Project |
Bangladesh |
Ministry of Agriculture |
Government of Bangladesh |
Sep-98 |
Jun-02 |
15 |
Feasibility Study for Comprehensive South Comilla & North Noakhali Drainage Project |
Bangladesh |
Bangladesh Water Development Board |
Government of Bangladesh |
Dec-00 |
Dec-01 |
16 |
Gorai River Restoration Project. |
Bangladesh |
Bangladesh Water Development Board |
Government of the Netherlands. |
Oct-99 |
Apr-01 |
17 |
National Minor Irrigation Development Project (Government of Bangladesh Component)-Implementation of 1998 Flood Damage Rehabilitation Programme |
Bangladesh |
Ministry of Agriculture |
Government of Bangladesh |
Apr-99 |
Jun-00 |
Survey & Investigation |
|
|
|
|
1 |
Data Collection Survey on Water Supply Sector in Local Municipalities in Bangladesh |
Bangladesh |
Tokyo Engineering Consultants Co., Ltd |
Japan International Cooperation Agency |
Apr-12 |
July, 2012 |
2 |
Municipal Capacity Development (MCD) for City Region Development Project (CRDP) |
Bangladesh |
Local Government Engineering Department |
Asian Development Bank |
Aug-12 |
Aug-14 |
3 |
Socio-Economic Baseline Survey for Chittagong Hill Tracts Rural Development Project |
Bangladesh |
Chittagong Hill Tracts Regional Council |
Asian Development Bank |
Feb-06 |
Jan-07 |
4 |
Monitoring of CFW and FS Schemes under PFRP (BAG/04/009) |
Bangladesh |
United Nations Development Programme , Dhaka |
United Nations Development Programme |
May-05 |
Jul-05 |
5 |
Monitoring of post-flood activities of NGOs under Nonfood Emergency Humanitarian Assistance Programme |
Bangladesh |
United Nations Development Programme , Dhaka |
United Nations Development Programme |
Dec-04 |
Feb-05 |
6 |
Coastal Embankment Rehabilitation Project (Phase-II) Impact Assessment study |
Bangladesh |
Bangladesh Water Development Board |
IDA Credit No. 2783-BD |
Sep-02 |
Dec-02 |
7 |
District Partnership Initiative Fund (DPIF) Evaluation – a component of Agricultural Services Innovation and Reform Project (ASIRP) |
Bangladesh |
Department of Agricultural Extension |
Department for International Development , UK |
Oct-02 |
Dec-02 |
8 |
Drilling Pad and Access Road Design Consultancy including Geotechnical Investigation, Lab works. |
Bangladesh |
Chevron Bangladesh Block Twelve Ltd |
Chevron Bangladesh Block Twelve Ltd |
Mar-11 |
Nov-11 |
9 |
Study to Restructure of Bangladesh Petroleum Exploration Company Ltd. (BAPEX) |
Bangladesh |
Bangladesh Oil, Gas and Minaral Corporation (PETROBANGLA) |
Government of Bangladesh |
Nov-96 |
May-97 |
10 |
Socio-Economic Baseline Survey for Chittagong Hill Tracts Rural Development Project |
Bangladesh |
CHT Regional Council |
Asian Development Bank |
Feb-06 |
Jan-07 |
11 |
Evaluation of the Upazila Partnership Initiative Fund Programme |
Bangladesh |
Department of Agricultural Extension |
Department of International Development , UK |
Jun-02 |
Sep-02 |
12 |
Techno economic Feasibility Study Feni – India |
Bangladesh |
Embassy of India |
Indian Fund |
Oct-17 |
Jul-18 |
Agriculture |
|
|
|
|
|
1 |
The Bangladesh Rural Enterprise and Agricultural Development Project, Phase-II (BREAD-II) |
Bangladesh |
Winrock International Institute for Agricultural Development. |
United States Department of Agriculture |
Jan-05 |
May-06 |
2 |
Command Area Development Project : DAE Component Part B |
Bangladesh |
Department of Agriculture Extension |
Asian Development Bank /Technical Assistance |
Oct-97 |
Oct-01 |
Waterways, Port & Harbor |
|
|
|
|
|
1 |
Improvement of Navigability and Providing Landing Facilities from Sadarghat to Ashulia Bridge |
Bangladesh |
Bangladesh Inland Water Transport Authority |
Government of Bangladesh |
Jan-01 |
Jun-01 |
2 |
Construction of R.C.C Jetty at Kutubdia |
Bangladesh |
Bangladesh Inland Water Transport Authority |
SAUDI Fund for Development (SFD) |
Jul-95 |
Dec-96 |
Others |
|
|
|
|
|
|
1 |
UGIIP-3-Project Management Design and Supervision |
Bangladesh |
Local Government Engineering Department |
Asian Development Bank |
Apr-15 |
Oct-18 |
2 |
Natural Gas Efficiency Project: Installation of Gas Compressors at Titas Location-C and Narsingdi |
Bangladesh |
Bangladesh Gas Fields Company Limited |
Japan International Cooperation Agency |
Feb-16 |
Jun-21 |
3 |
Concept and Detail Design for 53.64 acres Residential Development project (CDDRDP) |
Bangladesh |
United Group |
United Group |
Sep-18 |
May-20 |
4 |
Araihazare Industrial Park |
Bangladesh |
Sumitomo Corporation |
Sumitomo Corporation |
Dec-17 |
Feb-18 |